{"id":2963,"date":"2026-11-24T09:00:00","date_gmt":"2026-11-24T08:00:00","guid":{"rendered":"https:\/\/northline.es\/?p=2963"},"modified":"2026-11-10T15:56:30","modified_gmt":"2026-11-10T14:56:30","slug":"bilbao-bizkaia-water-consortium-investment-2027-2030","status":"publish","type":"post","link":"https:\/\/northline.es\/en\/bilbao-bizkaia-water-consortium-investment-2027-2030\/","title":{"rendered":"The Bilbao Bizkaia Water Consortium approves a 400.4 million euro investment programme for 2027-2030"},"content":{"rendered":"<p>On 27 October, the general assembly of the Bilbao Bizkaia Water Consortium (CABB) approved its 2027-2030 investment programme for water supply and sanitation: 400.4 million euros, an average of 100 million a year. It includes 164 projects across Bizkaia, 92 in water supply and 72 in sanitation. Of these, 65 are under way, 45 will be tendered or awarded in 2027 and 54 will start during the rest of the period. Eight exceed 20 million euros.<\/p>\n<p>In water supply, projects to interconnect systems and strengthen supply security during droughts carry significant weight:<\/p>\n<ul>\n<li><strong>Connection of Busturialdea to the Zadorra system<\/strong>, in Mungia: 57.7 million euros up to 2030, the largest water supply item. The district suffers from a resource deficit in the dry season. The works, in three lots, are due to be tendered in November 2026, will start in 2027 and will last about two and a half years.<\/li>\n<li><strong>Enkarterri trunk main<\/strong>, which will join the Zadorra-Venta Alta and Ordunte-Sollano systems in a ring: more than 31 million euros up to 2030. The section between the Kadagua river and the Sollano drinking water treatment plant (Zalla) is still to be tendered, in 2027.<\/li>\n<li><strong>Ballonti-Las Carreras pipeline<\/strong>: almost 32 million euros over three years to replace it and increase its capacity, from early 2027. The works will also lay a pipe for the future Galindo reclaimed water network.<\/li>\n<li><strong>Venta Alta drinking water treatment plant<\/strong>: 15.5 million euros for the full refurbishment of its second phase, in service since 1986, with tendering planned for the end of 2026.<\/li>\n<li>Four contracts to renew secondary networks, lasting four years and worth 30 million euros in total, from 2027.<\/li>\n<\/ul>\n<p>In sanitation, the largest item, almost 24 million euros, is to complete the Galindo stormwater tank in 2028. In Muskiz, work has already begun on the land outfall that will carry the effluent from the Muskiz wastewater treatment plant to an open-sea discharge point at the root of the Punta Lucero breakwater (4.8 million euros up to 2028). The Arriandi wastewater treatment plant, built in 1985, will receive 6.5 million euros to adapt it, among other things, to the new requirements of the EU Urban Wastewater Treatment Directive. At the Galindo plant, CABB plans to tender a pilot plant in 2027 to test wastewater treatment, nutrient recovery and energy efficiency processes at full scale.<\/p>\n<p>The programme also includes hydraulic turbines at the Las Carreras and Ugarte service reservoirs and the Garaizar and Venta Alta drinking water treatment plants (1.4 million euros), and solar photovoltaic plants at several wastewater treatment plants, the Etxebarri stormwater tank and two pumping stations (2.8 million euros). According to CABB, these investments will enable it to produce from its own sources all the energy needed for water supply.<\/p>\n<p>The assembly also approved the 2027 budget, 264 million euros, the highest in the Consortium&#8217;s history, with 105.6 million for new investment, and a 4% increase in water supply, sanitation and wastewater treatment tariffs.<\/p>\n<p><em>Sources: <a href=\"https:\/\/www.consorciodeaguas.eus\/el-consorcio-de-aguas-bilbao-bizkaia-aprueba-una-inversion-record-de-400-millones-de-euros-hasta-2030-para-infraestructuras-de-abastecimiento-y-saneamiento\/\" target=\"_blank\" rel=\"noopener\">Bilbao Bizkaia Water Consortium<\/a>, press release of 27 October 2026, and <a href=\"https:\/\/www.industriambiente.com\/noticias\/20261028\/-consorcio-aguas-bilbao-bizkaia-invertira-400-millones-euros-en-infraestructuras-hasta-2030\" target=\"_blank\" rel=\"noopener\">IndustriAmbiente<\/a>, 28 October 2026 (both in Spanish). Image: Ordunte reservoir (Burgos, Spain), part of the Consortium&#8217;s supply system. <a href=\"https:\/\/commons.wikimedia.org\/wiki\/File:Ordunte_urtegi.jpg\" target=\"_blank\" rel=\"noopener\">Telle<\/a>, <a href=\"https:\/\/creativecommons.org\/licenses\/by-sa\/4.0\/\" target=\"_blank\" rel=\"noopener\">CC BY-SA 4.0<\/a>, via Wikimedia Commons (cropped).<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On 27 October, the general assembly of the Bilbao Bizkaia Water Consortium (CABB) approved its 2027-2030 investment programme for water supply and sanitation: 400.4 million euros, an average of 100 million a year. It includes 164 projects across Bizkaia, 92 in water supply and 72 in sanitation. Of these, 65 are under way, 45 will<\/p>\n","protected":false},"author":5,"featured_media":2959,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[54],"tags":[],"class_list":["post-2963","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Bilbao Bizkaia Water Consortium approves a 400.4 million euro investment programme for 2027-2030 - NorthLine<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/northline.es\/en\/bilbao-bizkaia-water-consortium-investment-2027-2030\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Bilbao Bizkaia Water Consortium approves a 400.4 million euro investment programme for 2027-2030 - NorthLine\" \/>\n<meta property=\"og:description\" content=\"On 27 October, the general assembly of the Bilbao Bizkaia Water Consortium (CABB) approved its 2027-2030 investment programme for water supply and sanitation: 400.4 million euros, an average of 100 million a year. It includes 164 projects across Bizkaia, 92 in water supply and 72 in sanitation. Of these, 65 are under way, 45 will\" \/>\n<meta property=\"og:url\" content=\"https:\/\/northline.es\/en\/bilbao-bizkaia-water-consortium-investment-2027-2030\/\" \/>\n<meta property=\"og:site_name\" content=\"NorthLine\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-24T08:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/northline.es\/wp-content\/uploads\/2026\/11\/embalse-de-ordunte-2x1-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Camilo Fern\u00e1ndez\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Camilo Fern\u00e1ndez\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/northline.es\\\/en\\\/bilbao-bizkaia-water-consortium-investment-2027-2030\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/northline.es\\\/en\\\/bilbao-bizkaia-water-consortium-investment-2027-2030\\\/\"},\"author\":{\"name\":\"Camilo Fern\u00e1ndez\",\"@id\":\"https:\\\/\\\/northline.es\\\/en\\\/#\\\/schema\\\/person\\\/0a622bf3b8a17b1a2091fbe6714434a8\"},\"headline\":\"The Bilbao Bizkaia Water Consortium approves a 400.4 million euro investment programme for 2027-2030\",\"datePublished\":\"2026-11-24T08:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/northline.es\\\/en\\\/bilbao-bizkaia-water-consortium-investment-2027-2030\\\/\"},\"wordCount\":500,\"image\":{\"@id\":\"https:\\\/\\\/northline.es\\\/en\\\/bilbao-bizkaia-water-consortium-investment-2027-2030\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/northline.es\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/embalse-de-ordunte-2x1-1.jpg\",\"articleSection\":[\"Noticias\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/northline.es\\\/en\\\/bilbao-bizkaia-water-consortium-investment-2027-2030\\\/\",\"url\":\"https:\\\/\\\/northline.es\\\/en\\\/bilbao-bizkaia-water-consortium-investment-2027-2030\\\/\",\"name\":\"The Bilbao Bizkaia Water Consortium approves a 400.4 million euro investment programme for 2027-2030 - NorthLine\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/northline.es\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/northline.es\\\/en\\\/bilbao-bizkaia-water-consortium-investment-2027-2030\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/northline.es\\\/en\\\/bilbao-bizkaia-water-consortium-investment-2027-2030\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/northline.es\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/embalse-de-ordunte-2x1-1.jpg\",\"datePublished\":\"2026-11-24T08:00:00+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/northline.es\\\/en\\\/#\\\/schema\\\/person\\\/0a622bf3b8a17b1a2091fbe6714434a8\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/northline.es\\\/en\\\/bilbao-bizkaia-water-consortium-investment-2027-2030\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/northline.es\\\/en\\\/bilbao-bizkaia-water-consortium-investment-2027-2030\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/northline.es\\\/en\\\/bilbao-bizkaia-water-consortium-investment-2027-2030\\\/#primaryimage\",\"url\":\"https:\\\/\\\/northline.es\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/embalse-de-ordunte-2x1-1.jpg\",\"contentUrl\":\"https:\\\/\\\/northline.es\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/embalse-de-ordunte-2x1-1.jpg\",\"width\":1600,\"height\":800,\"caption\":\"Embalse de Ordunte visto desde lo alto, entre montes con bruma\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/northline.es\\\/en\\\/bilbao-bizkaia-water-consortium-investment-2027-2030\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/northline.es\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Bilbao Bizkaia Water Consortium approves a 400.4 million euro investment programme for 2027-2030\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/northline.es\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/northline.es\\\/en\\\/\",\"name\":\"NorthLine\",\"description\":\"Ingenier\u00eda construcci\u00f3n y medio ambiente\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/northline.es\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/northline.es\\\/en\\\/#\\\/schema\\\/person\\\/0a622bf3b8a17b1a2091fbe6714434a8\",\"name\":\"Camilo Fern\u00e1ndez\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/86245b6d3a985fba2c2ce483c19344a5eb2cc222498aac8c5e38fdf03d681e5a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/86245b6d3a985fba2c2ce483c19344a5eb2cc222498aac8c5e38fdf03d681e5a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/86245b6d3a985fba2c2ce483c19344a5eb2cc222498aac8c5e38fdf03d681e5a?s=96&d=mm&r=g\",\"caption\":\"Camilo Fern\u00e1ndez\"},\"url\":\"https:\\\/\\\/northline.es\\\/en\\\/author\\\/camilof-2024\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Bilbao Bizkaia Water Consortium approves a 400.4 million euro investment programme for 2027-2030 - NorthLine","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/northline.es\/en\/bilbao-bizkaia-water-consortium-investment-2027-2030\/","og_locale":"en_US","og_type":"article","og_title":"The Bilbao Bizkaia Water Consortium approves a 400.4 million euro investment programme for 2027-2030 - NorthLine","og_description":"On 27 October, the general assembly of the Bilbao Bizkaia Water Consortium (CABB) approved its 2027-2030 investment programme for water supply and sanitation: 400.4 million euros, an average of 100 million a year. It includes 164 projects across Bizkaia, 92 in water supply and 72 in sanitation. Of these, 65 are under way, 45 will","og_url":"https:\/\/northline.es\/en\/bilbao-bizkaia-water-consortium-investment-2027-2030\/","og_site_name":"NorthLine","article_published_time":"2026-11-24T08:00:00+00:00","og_image":[{"width":1600,"height":800,"url":"https:\/\/northline.es\/wp-content\/uploads\/2026\/11\/embalse-de-ordunte-2x1-1.jpg","type":"image\/jpeg"}],"author":"Camilo Fern\u00e1ndez","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Camilo Fern\u00e1ndez","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/northline.es\/en\/bilbao-bizkaia-water-consortium-investment-2027-2030\/#article","isPartOf":{"@id":"https:\/\/northline.es\/en\/bilbao-bizkaia-water-consortium-investment-2027-2030\/"},"author":{"name":"Camilo Fern\u00e1ndez","@id":"https:\/\/northline.es\/en\/#\/schema\/person\/0a622bf3b8a17b1a2091fbe6714434a8"},"headline":"The Bilbao Bizkaia Water Consortium approves a 400.4 million euro investment programme for 2027-2030","datePublished":"2026-11-24T08:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/northline.es\/en\/bilbao-bizkaia-water-consortium-investment-2027-2030\/"},"wordCount":500,"image":{"@id":"https:\/\/northline.es\/en\/bilbao-bizkaia-water-consortium-investment-2027-2030\/#primaryimage"},"thumbnailUrl":"https:\/\/northline.es\/wp-content\/uploads\/2026\/11\/embalse-de-ordunte-2x1-1.jpg","articleSection":["Noticias"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/northline.es\/en\/bilbao-bizkaia-water-consortium-investment-2027-2030\/","url":"https:\/\/northline.es\/en\/bilbao-bizkaia-water-consortium-investment-2027-2030\/","name":"The Bilbao Bizkaia Water Consortium approves a 400.4 million euro investment programme for 2027-2030 - NorthLine","isPartOf":{"@id":"https:\/\/northline.es\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/northline.es\/en\/bilbao-bizkaia-water-consortium-investment-2027-2030\/#primaryimage"},"image":{"@id":"https:\/\/northline.es\/en\/bilbao-bizkaia-water-consortium-investment-2027-2030\/#primaryimage"},"thumbnailUrl":"https:\/\/northline.es\/wp-content\/uploads\/2026\/11\/embalse-de-ordunte-2x1-1.jpg","datePublished":"2026-11-24T08:00:00+00:00","author":{"@id":"https:\/\/northline.es\/en\/#\/schema\/person\/0a622bf3b8a17b1a2091fbe6714434a8"},"breadcrumb":{"@id":"https:\/\/northline.es\/en\/bilbao-bizkaia-water-consortium-investment-2027-2030\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/northline.es\/en\/bilbao-bizkaia-water-consortium-investment-2027-2030\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/northline.es\/en\/bilbao-bizkaia-water-consortium-investment-2027-2030\/#primaryimage","url":"https:\/\/northline.es\/wp-content\/uploads\/2026\/11\/embalse-de-ordunte-2x1-1.jpg","contentUrl":"https:\/\/northline.es\/wp-content\/uploads\/2026\/11\/embalse-de-ordunte-2x1-1.jpg","width":1600,"height":800,"caption":"Embalse de Ordunte visto desde lo alto, entre montes con bruma"},{"@type":"BreadcrumbList","@id":"https:\/\/northline.es\/en\/bilbao-bizkaia-water-consortium-investment-2027-2030\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/northline.es\/en\/"},{"@type":"ListItem","position":2,"name":"The Bilbao Bizkaia Water Consortium approves a 400.4 million euro investment programme for 2027-2030"}]},{"@type":"WebSite","@id":"https:\/\/northline.es\/en\/#website","url":"https:\/\/northline.es\/en\/","name":"NorthLine","description":"Ingenier\u00eda construcci\u00f3n y medio ambiente","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/northline.es\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/northline.es\/en\/#\/schema\/person\/0a622bf3b8a17b1a2091fbe6714434a8","name":"Camilo Fern\u00e1ndez","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/86245b6d3a985fba2c2ce483c19344a5eb2cc222498aac8c5e38fdf03d681e5a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/86245b6d3a985fba2c2ce483c19344a5eb2cc222498aac8c5e38fdf03d681e5a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/86245b6d3a985fba2c2ce483c19344a5eb2cc222498aac8c5e38fdf03d681e5a?s=96&d=mm&r=g","caption":"Camilo Fern\u00e1ndez"},"url":"https:\/\/northline.es\/en\/author\/camilof-2024\/"}]}},"_links":{"self":[{"href":"https:\/\/northline.es\/en\/wp-json\/wp\/v2\/posts\/2963","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/northline.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/northline.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/northline.es\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/northline.es\/en\/wp-json\/wp\/v2\/comments?post=2963"}],"version-history":[{"count":1,"href":"https:\/\/northline.es\/en\/wp-json\/wp\/v2\/posts\/2963\/revisions"}],"predecessor-version":[{"id":2964,"href":"https:\/\/northline.es\/en\/wp-json\/wp\/v2\/posts\/2963\/revisions\/2964"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/northline.es\/en\/wp-json\/wp\/v2\/media\/2959"}],"wp:attachment":[{"href":"https:\/\/northline.es\/en\/wp-json\/wp\/v2\/media?parent=2963"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/northline.es\/en\/wp-json\/wp\/v2\/categories?post=2963"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/northline.es\/en\/wp-json\/wp\/v2\/tags?post=2963"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}